
The crew behind every working faucet
on Meridian Boulevard.
Commercial rough-in, medical gas, grease trap permitting — Fresno & Madera counties, ten-minute response radius.
We've worked your block.
Hover a pin to see the building type, scope, and what the GC had to say.
Meridian Strip Mall
Full rough-in, 14 fixtures, 3-week schedule
"Inspections cleared first visit, every time."
— Ruiz General Contracting
North Fresno Medical Plaza
Medical gas, backflow, 6 exam rooms
"They had the permit in hand before our framing was done."
— Delgado Build Group
Fig Garden Restaurant Row
Grease trap, hood drain, health dept. approval
"We opened on Tuesday. Health inspector signed off Monday."
— Okonkwo & Sons Construction
Clovis Tech Park
Tenant improvement, 22 fixtures, 4-floor stack
"Fast, clean, zero callbacks on the punch list."
— Whitmore Commercial Builders
Shaw Ave. Property Management
Multi-tenant retrofit, cast iron replacement
"Our go-to sub for anything with a pipe."
— Patel Property Group
Madera Medical Center
Expansion wing, sterile water, 8-week schedule
"Code-compliant, on budget, no surprises."
— Sierra Valley Contractors
Your inspector
already knows us.
We've been pulling permits in Fresno and Madera counties since 2014. The same inspectors who signed off on your last job know our work by name — because we've never given them a reason to call back.
Every job ships with a complete permit package: drawings, cut sheets, and a pre-inspection checklist. Your GC hands it to the inspector. Done.
- Fresno City Building Dept.
- Fresno County Environmental
- Madera County Planning
- Central Valley Health District
- Cal OSHA — Plumbing Division
- Fresno Fire Marshal
- Fresno City Building Dept.
- Fresno County Environmental
- Madera County Planning
- Central Valley Health District
- Cal OSHA — Plumbing Division
- Fresno Fire Marshal
340+
Permits Pulled
Fresno & Madera counties, 2018–2026
1st
Inspection Pass Rate
94% of commercial jobs pass first visit
48h
Permit Turnaround
Average from submittal to approval
12yr
Inspector Relationship
Same inspectors, same faces, same trust
Permit Package Included
Every bid includes permit drawings and submittal docs at no extra charge.
Pre-Inspection Walkthrough
We walk the job with your super before the inspector arrives.
On-Call for Inspector Questions
Inspector has a question? We pick up. You never have to translate.
Ten minutes from your job site.
Guaranteed 2-hour response to any commercial service call within our radius.

Maximum response time, any commercial call, within service radius.
Restaurant & Food Service
Grease traps, hood drains, pre-rinse units, health dept. coordination. We know what the inspector wants before they walk in.
New builds · Remodels · Tenant change
Medical & Office
Medical gas piping, backflow prevention, multi-floor stacks. We carry the insurance and the license your GC requires.
Exam rooms · Labs · TI work
Strip Mall & Retail
Full rough-in for multi-tenant retail. We coordinate with the GC schedule so drywall never waits on us.
Cast Iron & Copper
We sweat copper and thread cast iron in-house. No subs, no handoffs, every joint done by our own crew.
Service & Maintenance
Existing commercial accounts get priority scheduling, documented service history, and annual backflow testing.
Ask the GC next door.
Every name below is a real contractor in the valley. Call them. We'd do the same for you.
"Flow pulled the permit, coordinated with the inspector, and had rough-in done two days ahead of our framing schedule. I've never had a plumbing sub that made my life easier — until now."

Marcus Ruiz
Project Superintendent, Ruiz General Contracting
Project
Meridian Strip Mall, 14-unit build-out
"We had a restaurant client with a health inspector walkthrough on a Tuesday. Flow installed the grease trap Friday, got the permit signed Monday morning. That's the kind of sub you keep on speed dial."

Priya Delgado
Principal, Delgado Build Group
Project
Fig Garden Restaurant Row
"Six exam rooms, medical gas, backflow — everything code-compliant, zero callbacks, first inspection passed. I give their number to every GC I know in the valley."

David Okonkwo
Owner, Okonkwo & Sons Construction
Project
North Fresno Medical Plaza
"Property management means you're always juggling three tenants and two emergencies. Flow picks up the phone, shows up when they say, and documents everything. That's rare."

Sarah Whitmore
Director of Operations, Whitmore Commercial Properties
Project
Shaw Ave. multi-tenant retrofit
"Four floors, 22 fixtures, one punch list item — a missing cleanout cap. That's the tightest commercial rough-in I've seen in fifteen years of building in Fresno."

Anand Patel
VP Construction, Patel Property Group
Project
Clovis Tech Park, 4-floor stack
Ready to walk the job?
Tell us the building type, square footage, and your timeline. We'll put together a scope and number before your next site meeting.